Showing posts with label Landfill. Show all posts
Showing posts with label Landfill. Show all posts

Friday, 12 November 2010

Consult River Birch landfill claim: an editorial - Nola.com

Waste management has transformed every reason suspicion on the relationship between Jefferson Parish and his opponent River Birch landfill, located next door, the parish dump, waste management operates.




>
>


Susan poag, the Times-Picayune Archives installing truck backs up his last as a compactor garbage in the River Birch landfill.
Jefferson Parish action to his contract with waste management cut short, so that it send a 25-year contract over $160 million garbage to the private site, River Birch adopt kann.Angesichts of this situation, it would be easy to dismiss accusations by waste management, the unnamed parish officials made secret handles garbage from the parish dump to River Birch abzulenken.Abfall management made the claim in its reply to the action of parish of.


It would also be a mistake not to make waste management's demands, in view of the issues surrounding the landfill deal swirling.


The company said that parish had officials "undisclosed and improper personal contractual relations" with river birch, that these officials "Improper influence, violations of the law and bad faith" issued River Birch on waste management's cost to enrich.Waste management is paid to use a per-tonne fee the parish dump, and it calls his contract to run until all the cells are filled.


Jefferson officials and lawyers have to comment on waste management's rejected claims, although parish spokeswoman
Pat borne said waste management "specific factual information on the allegations has not established are." "


The parish contract with river birch, which was approved in June 2009 during the Aaron Broussard Administration already tested Federal.A federal grand jury issued subpoenas for documents in connection with the deal after revelations that the wife of Tim Whitmer had health insurance with the company Vertrag.Herrn Whitmer, chief administrative officer for the Broussard administration, played a key role in the River Birch contract.


Mr. Broussard and Mr. Whitmer resigned in view of the federal criminal investigation of Broussard's administration and Mr. of Whitmer's private insurance using parish Auftragnehmern.Ehemalige parish Attorney Tom Wilkinson, who negotiated the River Birch Treaty also resigned.


Federal agents who seized documents Gretna offices of river Birch and issue subpoenas raided two weeks ago.


Federal investigators search clearly hard on this deal, these new allegations should get your attention.


View the original article here

Thursday, 14 October 2010

Choose the right the first Time … In landfill

The “New Economy”

With the recent economic downturn, even Waste has seen a hit. Granted, people are still throwing away garbage but they are not the “consumers” they were just two short years ago. And, with the housing market in the tank, there is a “New Economy” coming to all industries, even Waste.




>
>


What does the New Economy mean to the landfill? Now, and in the future, it is even more important to choose the right machine. Big or small. Versatile or single purpose.


Over the years and working with different landfills, we have seen companies choose the right machines and save substantial dollars over the life of the landfill.  Savings range from optimum machine utilization to lowered maintenance/service costs.  Savings can add up to millions. 


So, what are your Buying questions?


What should landfill machine buyers be considering, you may ask?  Here are some of the things we ask customers…


Weather/Climate.  What is your annual rainfall?  How long is your rain season? Hot or cold climate?




  1. Waste Type.  What type of waste are you receiving?  MSW? C&D? Industrial? Combination of all?


  2. Application.  What is your jobsite like?  Are you working uphill, downhill or on the flat?


  3. Correct Configuration.  For dozers understand your track requirements, for compactors look at wheels and tips, and for both look at types of optional guarding and waste specific cooling systems. What type of blade will you need? Are you pushing trash or dirt?  Are you pushing a short distance or a long distance?


  4. Ease of Operation.  Do you want a high tech or simple machine?  What are the capabilities of your operator?


  5. Tons (tonnes) Received.  80% of daily trash comes in 30% of the workday, so don’t just look at tons per day.  When is the higher percentage of your trash coming in?  How is your trash transported to the landfill? Is it in 5-7 ton loads, 15-ton loads or semi trailer transfer loads?


  6. Multiple Tasks.  What is your annual budget?  Can you afford job specific machines or do you need a more versatile machine?  For example, can you afford a motor grader to maintain your haul roads or do you need a machine that can do production and site maintenance?


  7. Cover.  What are you going to use for cover?  What are your underfoot conditions like?  What are your haul roads like; can you use highway trucks? 


  8. Priorities.  Understand that there may be trade offs as you make your machine selection.  For example, a machine bought for its versatility may not be as productive as you want it to be.

Sometimes when asking these questions, customers give us strange looks.  Then, when we explain why, customers understand we are making sure we put the right equipment in their landfill.  So just out of curiosity, do you look at all these factors in your machine buying decision?  Are there other questions you ask to make sure you spec the right machine? 


View the original article here

Friday, 1 October 2010

Landfill gas, not a threat to a major landfill, but an asset

Gas in landfill site produced s because of anaerobic digestion of biodegradable organic waste is, and this is the big other environmental threat of landfill sites under landfill leachate. Anaerobic digestion (AD) is known for a long time and is one of the oldest processes for the stabilization of sludge's used. Dealing with the decomposition of organic and inorganic matter in the absence of molecular oxygen and it happens in a landfill after 6 to 18 months of Tip If the landfill methanogenen (producing natural gas) turns. anaerobic bacterial fermentation produces organic alcohols and acids as by-products. In addition, metals at this stage of life in a modern landfill to your Ionian State are reduced.

All landfills are large bioreactors. Some special bioreactor landfills were built around the world.They are created, by the deliberate introduction and recirculation trying this model of liquids in a landfill for the early decomposition to promote you respond the outbreak of decomposition on the problem of serious risks delayed until a future date when maintenance either very expensive or should continue to undo is made.

This is because LFGE produces electricity at lower cost than other renewable fuels and therefore bioreactors provide good energy production potential to maximize production from landfill gas. In fact, some renewable energy advocates look at the energy market even have indicated that other technologies like wind by investing into LFGE which interferes with perhaps will slow the development of clean energy sources.

Open landfills in several categories, including: demolition, industrial, municipal and local waste combustor mixed ashes. Learn more about open landfills in Minnesota is available from the link below. Open and excavations these areas would be counterproductive productive, to forget in the plan of sealing and primarily on the waste.

What is, but in this respect said never forget that methane landfill is an excellent and often untapped resource.Most of the times gases are simply entbrannte or burnt into the atmosphere.However, growing interest in the use of landfill gas to fuel Stromerzeugung.In USA, methane dump is indeed a growing number of landfill s captured and burned for energy production, which mitigates global warming effect of methane and the production of electricity and/or heat.

Requirements are in the United States for the control of methane from MSW landfill gegeben.Die concentration of methane is not more than 25% structures, the border at the attachment limit exceed. measures of the lower explosive limit in annex under the Clean Air Act and regulatory authorities require active and/or passive mechanisms in MSW landfills used to all emissions including VOC control.

In Germany gas production must only under federal law be considered and for MSW there a specified 10% landfill, limitation of VOC emissions. Moreover, an operational guideline is that waste should be closely spaced (to avoid air bubbles) where gas is likely to arise.








Landfill gas as an asset is also a part of the landfill gas resources Web site and by Steve Evans, the author of many articles on the dog breeds-written blog.